Product Description
High Precision Aluminium Cabinet
Aluminium Alloy Material, Solid Frame, Non-Deformed, For Free To Disassembly And Assembly, Splicing Accuracy , Flatness.
TUV Certificated Multi-Function Hanging Bar
For Easy To Use As Hanging Or Ground Basement,High Strength Structure,Non-Deformed TUV Certification.
Fast Assemble &Cable Free Design
With fast lock design,U Series,Is More Easy And Fast To Assemble And Disassemble,Cable Free Design Means
That There ls No Cable Connection Between The LED Module And The Receiver Card Which Makes The Signal Transmission More Stable.
High Strength Corner Protector
Fold Able All-Around Corner Protector,Each Pixel Well-Protected.
Widely Applications
U Series widely used for indoor andoutdoor events,concerts,fasion shows,exhibitions etc rental market,and for fixed installation
Product Parameters
Model Name |
IU19 |
IU26 |
IU29 |
IU39 |
Pixel Pitch |
1.95 mm |
2.604 mm |
2.97 mm |
3.91 mm |
Pixel Density/m2 |
262,144 dots |
147,456 dots |
112,896 dots |
65,536 dots |
LED Configuration |
SMD1515 |
SMD1515 |
SMD1515/SMD2020 |
SMD2020 |
Module Size |
250mm * 250mm |
Module Resolution |
128 * 128 dots |
96 * 96 dots |
84 * 84 dots |
64 * 64 dots |
Panel Dimension |
500 * 500 * 75mm |
Panel Resolution |
256 * 256 dots |
192 * 192 dots |
168 * 168 dots |
128 * 128 dots |
Driving Mode |
1/32 |
1/32 |
1/28 |
1/16 |
Brightness |
≥ 800 CD/M2 |
≥ 1000 CD/M2 |
≥ 1000 CD/M2 |
≥ 1200 CD/M2 |
Color processing bits |
14 ~ 16 bit |
Cabinet raw material |
Aluminum Die-Casting |
Applicable standards |
CCC TUV-CE ETL |
Certifications
Production Process

Packing

FAQ
Q. How long time is needed to produce? A. Our production time is 3-15 working days.
Q. How long does shipping take? A. Express and air shipping usually take 5-10 days. Sea shipping takes about 15-55 days according to different country.
Q. What trade terms do you support? A. We usually do FOB, CIF, DDU, DDP, EXW terms.
Q. This is the first time to import, I don't know how to do. A. We offer DDP door to door service, you just need to pay us, then wait to receive order.
Q. Do I need to buy other equipment to install LED screen? A. You just need to prepare structure and installation tools.